  • The total cost required for an 815km AC transmission line is 1201 $M, with a cost of 1.47 $M/km, which is 1.35 times of HVDC line cost.

    For a 815km transmission line, HVAC infrastructure costs about $1798 million and HVDC costs about $1445 million.

    Because HVDC brings savings of up to $353 million per project versus its HVAC counterpart, increasingly, governments in Asia are evaluating the use of HVDC to connect areas with no available transmission line to the main national grid.

    However, it is difficult to determine the exact cost of an HVDC system because each project has different features and circumstances. The use of international benchmarks will help guide your team understand all the important considerations and ensure that you implement correctly.

     